Charlie's Paving Inc provides asphalt services, commercial asphalt paving, driveway services, parking lot services, residential asphalt paving and specialized paving services in New Jersey and surrounding states.
Frequently Asked Questions About Charlie's Paving Inc
How long does a commercial paving project typically take?
The duration of commercial paving projects varies based on the project's scope and complexity. Smaller parking lots may be completed within a few days, while larger facilities can take several weeks. The process involves multiple stages, including site preparation, grading, base installation, paving, striping, and allowing time for the asphalt to cure properly.
When can we start using the newly paved surface?
For newly paved surfaces, light use such as pedestrian traffic and passenger vehicles is generally safe after 48 hours. However, we recommend waiting up to 7 days before allowing heavier vehicles or full use of the area. This waiting period ensures proper curing and compaction of the asphalt surface.
Do we need permits for commercial paving in New Jersey?
Yes, permits are typically required for commercial paving projects in New Jersey. Most municipalities require a Non-Residential Paving & Restriping Permit, which can be obtained through local engineering or zoning departments. This is especially true for projects within commercial or industrial zones.
Why is proper drainage critical in paving projects?
Proper drainage is crucial in paving projects to prevent water from penetrating beneath the pavement. When water seeps under the surface, it can lead to various issues such as cracking, pothole formation, and premature deterioration of the asphalt. Adequate grading and drainage systems help maintain the integrity and longevity of the paved surface.
What's the difference between asphalt paving and milling/resurfacing?
Asphalt paving involves installing a complete new pavement structure from the base layer up to the wear surface. In contrast, milling and resurfacing is a process where only the top layer of existing asphalt is removed and replaced with a new layer. This method is often used for surface renewal without disturbing the underlying base structure.
How should I prepare my driveway area before paving?
Before paving begins, please remove all vehicles, debris, and obstructions from the site. Our team will handle the necessary excavation, ensure a stable base of 8-12 inches, verify proper drainage slopes, and confirm that no underground utilities will interfere with the paving process. Your cooperation in clearing the area helps us start the project efficiently.
How long does a residential driveway paving project take?
A typical residential driveway paving project is completed within 1-2 days, not including any additional time needed for preparatory work such as grading or excavation. After paving, we recommend allowing 24-48 hours before walking on the surface, 48-72 hours before driving on it, and up to a week for full curing.
What maintenance is needed to extend the life of my paved driveway?
To maximize the lifespan of your paved driveway, we recommend applying a sealcoat every 2-3 years to protect against water, UV rays, and oil damage. Promptly filling any cracks that appear helps prevent water infiltration and further deterioration. Additionally, annual inspections can help identify and address issues like potholes or surface wear early, making repairs more manageable and cost-effective.
When can vehicles use the new pavement?
Light vehicles can typically use the new pavement after 24-48 hours. However, for heavy vehicles or high-traffic use, we advise waiting 3-7 days. This allows sufficient time for the asphalt to cure and compact properly, ensuring the longevity and durability of your new pavement.